Loading...

Petro Niro Saba HQ

نورپردازی دفتر مرکزی پترو نیرو صبا

Project Details

  • Employer: Petro Niro Saba
  • Location: Pasdaran
  • Architect: Mr Zargar
  • Date: Fall 2022
  • Executive team: Haft Boom Architecture Studio
  • Photographer: Saman Zavarian

Project Description

The lighting production and equipment for Petro Niro Saba company, located in a 3000 square meter area across six floors in Pasdaran, was one of the notable projects by ModularPro Lighting Company. Given the large scale of this project and the need for adequate lighting, it was meticulously designed and executed. Various magnetic and non-magnetic multi-track systems were utilized, allowing for flexibility in lighting and adjustments according to different needs. Additionally, specific linear lights were designed for the conference halls, contributing to a professional and modern atmosphere. The use of advanced technologies and precise design in this project has provided a unique lighting experience for users, making this space a significant asset for Petro Niro Saba.

Petro Niro Saba HQ 171
Petro Niro Saba HQ 172
Petro Niro Saba HQ 173
Petro Niro Saba HQ 174
Petro Niro Saba HQ 175
Petro Niro Saba HQ 176
Petro Niro Saba HQ 177
Petro Niro Saba HQ 178
Petro Niro Saba HQ 179
Petro Niro Saba HQ 180
Petro Niro Saba HQ 181
Petro Niro Saba HQ 182
Petro Niro Saba HQ 322
×